WB27-MNE-ENV-01 Nikšić Wastewater Management System: Sewerage Network Phase II

Awesome Image

  • Client:
    Nikšić Municipality
  • Date:
    2023-2024
  • Budget:
  • Location:
    Nikšić

Within the framework of IPF 8 project WB27-MNE-ENV-01 Nikšić Wastewater Management System: Sewerage Network Phase II, Feasibility Study, Environmental and Social Impact Assessment, Detailed Design and Tender Documentation, Nik Com d.o.o. did:

– optional analysis;

– conceptual design;

– the main design.

This technical documentation covers the sewage system for wastewater from the settlements: Dragova Luka, Oštrovac, Ćemenca and Rubeža, with a total length of approx—40 km.

The sewage network in the settlements that are the subject of the project consists of a system of primary and secondary collectors, a pumping station and household connections.

Wastewater from the Rubeža settlement is planned to outflow to the existing manhole of the city’s sewage system (in accordance with the conditions of “Vodovod i kanalizacija” d.o.o. Nikšić). Wastewater from other settlements, which are the subject of the project, will be collected to the new pumping station (PS “Ćemenca”), from which they will be pumped to the existing PS Duklo (in accordance with the conditions of “Vodovod i kanalizacija” d.o.o. Nikšić). The project budget is approximately 10 million euros.