Nik Com is the reviewer of the entire technical documentation, which is composed of 11 main designs of the city sewage collectors as part of the secondary sewage network. The expansion of the secondary sewage network is planned in the urban parts of Podgorica. The total length of the planned sewage network in Phase I, which is in these designs, is about 18.5 km.
These designs are an integral part of the project “Design, construction and approval of design parameters of technology and capacity of waste water treatment plant, sludge incineration plant and sewage extension” which is based on the approved Feasibility Study from 2017.
The project does not only include the construction of a new WWTP, but also the necessary measures for the adequate and sustainable future functioning and management of the treatment plant and the sewage system.
The Investor of the project is the CAPITAL CITY OF PODGORICA and “WATER SUPPLY AND WASTE WATER” ltd PODGORICA.
Year 2020