Nik Com is the auditor of the entire technical documentation as part of the main projects of the secondary sewage network zones 1, 2, and 3 in Danilovgrad. The total length of the sewage collectors, which are the subject of the project, is about 7 km.
Currently, the city of Danilovgrad is covered by a sewage system on a minor part of its territory, and wastewater is drained directly into the Zeta River. Another wastewater is discharged into septic tanks. The subject of the project is the sewage network system to ensure the reliable collection of wastewater, which will be treated at the future WWTP Danilovgrad. Part of the project also includes the reconstruction of the existing sewage system. The new sewage system is divided into six zones, and zones 1, 2, and 3 are covered by this main design.