The purpose of the project “Infrastructure project of the Municipality of Danilovgrad – construction of a wastewater treatment plant (WWTP) in Danilovgrad” is to solve the treatment of wastewater through the construction of a wastewater treatment plant. A team of our experts revised complex technical documentation as part of the main project of the wastewater treatment plant. water (WWTP) in Danilovgrad.
This project is accompanied by the “Infrastructural Project of the Municipality of Danilovgrad – Reconstruction of the Sewerage Network System”, which refers to solving the problem of waste water collection in the city of Danilovgrad through the construction of a sewerage network. Our company is also the reviewer of the technical documentation that envisages the construction of the mentioned sewage network.
The very implementation of these projects will ensure improved water quality in the Zeta River, where waste water is currently discharged without an adequate treatment process. Waste water will be treated in the new WWTP.
A wastewater treatment plant with the following capacities is planned:
Phase 1 – designed capacity of 6,000 ES,
Phase 2 – 12,000 ES.
The main project consists of the following parts:
GEOLOGICAL AND HYDROGEOLOGICAL REPORT
WWTP TECHNOLOGY PROJECT
ARCHITECTURE PROJECT
CONSTRUCTION PROJECT
PROJECT OF HYDROTECHNICAL INSTALLATIONS AND HYDRAULIC CALCULATION OF THE WWTP
PROJECT OF MECHANICAL AND THERMOTECHNICAL INSTALLATIONS
ELECTRICAL INSTALLATION PROJECT
ELECTRICAL INSTALLATION PROJECT – high power
ELECTRICAL INSTALLATION PROJECT – low power
PROJECT OF MEASURING EQUIPMENT AND AUTOMATIC CONTROL
PROJECT OF THE ROAD
FIRE PROTECTION PROJECT
ELABORATION OF PROTECTION AND HEALTH AT WORK
ORGANIZATION AND CONSTRUCTION TECHNOLOGY