The preliminary design of infrastructure for the export of water to tankers
This design defines all the infrastructure needed for filling and transporting water to 300,000 tonnes of tankers. The design covers the land and marine parts of the infrastructure. The land part includes a system of pipelines (the connection of main pipe is planned to the existing tank) and a break chamber, which regulates the pressure